Andun Engineering Consultants Ltd: Savings on Energy Costs
At A Glance
Company: Andun Engineering Consultants Ltd
Location: Newcastle-Under-Lyme
Activity: The design of temporary works, complex demolition and specialist lifting equipment.
Support: Free Energy Assessment, and Low Carbon Grant
Project: Installation of a Boiler and LED Lighting
Staffordshire Supplier: A&L Services, and CEPS
Project Cost: £5,604
Grant: £2,802
Savings – £ / yr: 2,024
Savings – kWh / yr: 15,150
Savings – CO2 tonnes / yr: 2.93
Payback Period (without Grant) / yr: 2.7
Lengthening Lifespans
Andun Engineering Consultants Ltd, a specialist consultancy for temporary works design and demolition engineering, moved forward in installing new LED Lighting and a Boiler in their Newcastle-under-Lyme Office. The benefits of the LED Lighting were outlined in their initial Energy Assessment. It showed that the new LED lighting lamps should have a minimum lifespan of 30,000 hours, compared to the old lighting system that gave them only 15,000 hours. The lengthening of its lifespan was not the only benefit as it also reduces maintenance costs, improves lighting quality, saves energy by roughly 1,840 kWh per year, and carbon by 0.41 tonnes per year.
“The new lights provide a more comfortable office environment.”

Saving a 1/3 on Energy Costs
The second installation that Andun Engineering Consultants Ltd introduced was a modern boiler. This replacement would increase the efficiency from 60% to >92% and save them one third on money, energy, and carbon!
“The boiler is more efficient and heats water quicker, which has been well received by the occupants.”

Financial Aid
Not everyone can afford to move on with projects if their budgets are tight, but our support has enabled businesses to move forward on projects that would have otherwise been out of reach.
“We could not have moved forward with our building maintenance at the time, if it weren’t for the grant; it provided the funding that would not have been available in our budget…This has saved money from a financial perspective.”
Andun Engineering Consultants Ltd is now benefiting from its energy-efficient upgrades, with a payback period of 2.7 years, or 1.4 years once grant funding is included. After that, the business is expected to make annual savings of £2,024 that would otherwise have been spent on energy bills.
Find out more
If you would like to look into funding options then check out our sben Funding & Support page; or, join our sben membership for free and stay updated with funding opportunities and other possibilities through our monthly newsletter.